Project description: MSW treatment capacity 600t/d, build two 300t mechanical grate
Scope of supply : Steam turbine + Generator
Steam turbine model : N12-3.8
Main parameters : The steam pressure before the main steam valve of the steam turbine is 3.8Mpa, and the steam temperature before the main steam valve is 390°C.