Project description:Matching project of petrochemical industry (1 Mt/year DCC project); combined heat and power generation; high temperature and high pressure;
integral forging rotor
Scope of supply : Steam turbine + Generator
Steam turbine model : CB30-8.83/3.82/0.981
Main parameters:Inlet steam pressure 8.83Mpa, inlet steam temperature 535 °C; extraction pressure 3.82Mpa, extraction steam temperature 435.3 °C.